- Home
- ยป
- Our Products
- »
- Cup Lock System
Cup Lock System
Cuplock Scaffolding System
Minimum Order Quantity: 50 Kg
Product Brochure
Material | Mild Steel |
Surface Type | Color Galvanized |
Color | Blue |
Usage/Application | Building Construction |
Dimension | 3m |
Brand | Arshad Steel |
Pipe Thickness | 3mm |
Surface Treatment | Polished |
Number Of Cups | 5 |
To use cuplock scaffolding, first prepare the site by ensuring a level and stable ground, then lay the base plates, erect the vertical standards (inserting them into the base plates), attach the bottom cups, connect horizontal ledgers by inserting them into the lower cups on the standards, rotate the top cups to lock them in place, add transoms for extra support, install diagonal braces for stability, adjust base jacks if needed, and finally, install toe boards and guardrails as required, always inspecting the system thoroughly for proper connections before use; remember to follow safety guidelines and regulations when setting up and using cuplock scaffolding.Site preparation: Clear the area, check for level ground, and address any potential hazards.
Laying the base: Position the base plates on the ground where the vertical standards will be placed.
Erecting standards: Insert the vertical standards (also called "standards") into the base plates.
Attaching bottom cups: Secure the lower fixed cups onto the standards.